action1

Food Processing Plant

A 144 kW Eureka PTE system parallel connected to a 10,000 litre hot water storage cylinder, capable of producing nearly 3,000 litres of hot water per hour

Read the rest of this post »

action4b

Co-op

Eureka PTS and AG Systems installed at the Co-Op store in Witney Highlights of data taken from 1st March through to 14th March 2006 – highlighting operation of the Eureka Heat Recovery Systems 1.Internal shop temperature averaged 21.1 degrees Celsius …

Read the rest of this post »

action3

Centra

Eureka PTS and AG connected to a multipack compressor unit, to provide all heating and domestic hot water requirements for the Centra supermarket in Northern Ireland

Read the rest of this post »

mac

McDonalds

All hot water requirements at this McDonalds restaurant are provided by the Eureka PTS.

Read the rest of this post »